
Start Up
Procedure Check Points Yes No
d. Check oil pressure safety switch
e . C h e c k a n d a d j u s t l o w p r e s s u r e o r
temperature freeze control
f. Check and adjust operating thermostat
g. Check and adjust low pressure operating
control
h. Check and adjust expansion valve
superheat
Operating Data
Chiller
V o l t a g e : L - l _ L - 2 _ L - 3 _
Pressure gauge readings: a. Suction
b. Discharge
c . O i l ~
d . Net oil
Pressure
c-b =
High pressure switch setting: (cut in)
Checked setting Yes
Low pressure switch setting: (cut in)
Checked setting Yes
Low oil pressure switch checked Yes
Low pressure freeze control
If part winding start, time delay is
Temperature of air entering condenser
Temperature of air leaving condenser
Temperature of Chilled Water entering chiller
Temperature of Water (Chilled) leaving chiller
Chilled water pressure entering chiller
Chilled water pressure leaving chiller
psig
psig
psig
psig
psig _ psig (out)
No
psig
psig (out)
_ N o
No
Cut in
cut out
seconds.
p s i g
p s i g
Westinghouse Commercial Industrial Air Conditioning Division Staunton, VA.
In Canada: Westinghouse Canada Ltd. 492 Speers Road, Oakville, Ontario
World wide: Westinghouse Air Conditioning International
Westinghouse Bld, Gateway Center, Pittsburgh, PA. 16222
V8/77/6M