![Western multiplex Lynx 1xE1 Installation And Maintenance Manual Download Page 92](http://html1.mh-extra.com/html/western-multiplex/lynx-1xe1/lynx-1xe1_installation-and-maintenance-manual_962659092.webp)
INSTALLATION AND MAINTENANCE MANUAL
LYNX
E1 FAMILY
LICENSED & SPREAD SPECTRUM RADIOS
JUNE 2001
PAGE 3-72
SECTION 3: INSTALLATION & ADJUSTMENTS
An external BER test set is required for statistical BER analysis. Disconnect all external CEPT-1
signals and connect the BER test set to the input and output BNC connectors. Select external test
mode (see Section 3.12.2) and initiate loopback using the ENABLE loopback button. Now the BER
test can be initiated. Section 4.10 describes BER testing in more detail.
Loopback may be turned off at either end of the link by simply
pressing the ENABLE button at either end.
If two BER test sets are used to measure the link performance
(one at each end) separately in each direction, frame slips will
occur unless the BER test sets are synchronized with one test
set as the master and the other as the slave.
For multiple capacity radio models, repeat all operations for the
other channels if desired.
For multiple capacity radio models, only one loopback channel
may be used at any one time. Loopback cannot be performed on
more than one channel.