
HPT-15K/17K/20K/25K USER MANUAL 28
12.
RESTARTS
When reconnecting the inverter for electrical power supply, please follow the
commissioning procedures and safety instructions as described in
Section 6
when
applicable (e.g. DC Wires need to be reassembled).
Please run safety checks as described in
Section 7
before closing the DC Switch and
starting up again,
13.
CERTIFICATES
Grid Standards
EN50549-1, AS/NZS4777.2, G98, G99,
NBR16149, NB/T32004, IEC61727
Safety Standards
IEC/EN62109-1/-2, NB/T32004
Electromagnetic Compatibility (EMC)
EN61000-6-1, EN61000-6-2, EN61000-6-3, EN61000-6-4, NB/T 32004