
REV. 01 2013
9 / 24
CHAPTER 3 – TRANSPORTATION, UNPACKING AND STORAGE
3.1 TRANSPORTATION
x
The tire changer must be transported in its original packaging and kept in the position shown
on the package itself.
x
The packaged machine may be moved by means of a fork lift truck of suitable capacity. Insert
the forks at the points shown in figure 3.
3.2 UNPACKING
x
Remove the protective cardboard and the nylon bag.
x
Check that the equipment is in perfect condition, making sure that no parts are damaged or
missing. Use fig. 1 for reference.
If in doubt do not use the machine and contact your retailer.
3.3 STORAGE
In the event of storage for long periods of time, be sure to disconnect all sources of power and grease
the clamp sliding guides on the turntable to prevent them from oxidizing.
Summary of Contents for TITANIUM BIKE
Page 2: ......
Page 9: ...REV 01 2013 7 24 2 3 DANGER WARNING SIGNS Fig 2 ...
Page 14: ...REV 01 2013 12 24 ...
Page 26: ...REV 01 2013 24 24 STANDARD PNEUMATIC SYSTEM DIAGRAM ...
Page 27: ......
Page 28: ... 2 22 REV 01 2013 BODY TAV 1 1 ED 04 13 ...
Page 30: ... 4 22 REV 01 2013 HORIZ AND VERT ARMS TAV 2 1 ED 04 13 ...
Page 33: ... 7 22 REV 01 2013 PEDAL BOX TAV 3 1 ED 04 13 ...
Page 37: ... 11 22 REV 01 2013 BEAD BREAKER TAV 4 1 ED 04 13 ...
Page 40: ... 14 22 REV 01 2013 SELFͲCENTERING TURNTABLE TAV 5 1 ED 04 13 ...
Page 44: ... 18 22 REV 01 2013 3 MOTOR REDUCTION GEAR GROUP TAV 6 0 ED 04 13 ...
Page 47: ... 21 22 REV 01 2013 AIR LUBRICATOR GROUP TAV 8 1 ED 04 13 ...