WEMPE digital main clock 20097
Installation and putting into operation
V3.0 01/2011
21
1.8 Putting into operation
When delivered, the main clock is equipped, pre-set and pre-installed according to the basic
configuration that was ordered. Once the connections are fitted, the main clock is ready for
operation.
Future modifications of the main clock and the secondary clock system are carried out by
means of the menu functions.
Putting into operation the main clock:
1. Make sure that the polarity of all cable connections is correct, that the connection is
tight with a reliable contact.
2. Switch on the power supply. The following line appears on the display:
Ill. 7: Start display
L
Indication of the selected time.
After switch-on, the main clock is set to
L
ocal
T
ime.
00:00:00
Indication of time.
After switch-on, the main clocks starts to run at 0 o’clock.
2004.06.01
Indication of date.
After switch-on, the creation date of the software is indicated.