background image

13

Scaffold Introduction and Guideline_TUV

Safety work macro code

Use flow-through metal frame

1)  Mobile access tower, which can only be built or dismantled by qualified trainees

2)  The top guardrail frame of the mobile access tower shall not be less than 950 mm 

and not more than 1150 mm. The height of the guardrail in the middle shall not be less 

than 450 mm and shall not be higher than 600 mm. The height of the skirting board shall 

not be lower at 200 mm, the platform of the workbench must be sealed and stabilized.

3)  Mobile access tower must be inspected before they can be used.

4)  To ensure that the mobile access tower is adjusted to balance and stability, the 

frame components must be tightly fastened to prevent loosening due to shocks. At the 

same time, we must ensure that the ground is level, there is no recess, no height and 

inequality. The ground needs to be able to load the weight of the tower.

5)  The overall structure of the mobile access tower shall be stable. Refer to the manu-

facturer's plan when constructing. If necessary, other stable equipment such as: diagonal 

brace, stabilizer should be added.

6)  Damaged flow-through metal frame must be immediately stopped and notified to 

the superior.

7)  The frame shall be moved to ensure that the personnel on the mobile access tower 

have left and returned to the ground. When moving the tower, move all the materials and 

tools on the rack back to the ground to move the frame and make sure all nearby employ-

ees are in a safe position.

8)  The platform of the mobile access tower shall not be overloaded, and the materials 

and debris on the platform shall be cleaned frequently.

9)  It is not allowed to climb outside the platform of the mobile access tower.

10)  Each mobile access tower shall be marked with a specific reference number and 

the general rules for the manufacturer, and the number shall be on the valid document for 

inspection.

11)  Beware of horizontal and vertical loads (e.g. power tools, wind loads) which could 

generate instability. 

Summary of Contents for DW2000L

Page 1: ...Scaffold Introduction and Guideline SW2000L DW2000L Mobile Aluminium Tower 750 1350 Ladderspan 3T Through the Trapdoor Method...

Page 2: ...wever with the reverse unlocking plug two hands are needed to unplug the bracing thus highly promoting the security of the tower Welltech Modular Aluminum Scaffold boasts a comprehensive range of stan...

Page 3: ...who discover a serious defect in a scaf fold which may adversely affect their or another s safety should stop using that scaffold and report the defect to the site management Scaffold Users See whethe...

Page 4: ...which the mobile access tower is to be assembled and moved in level even no obstructions and capable for supporting the tower When moving the mobile access tower to another duty station no one should...

Page 5: ...e Raises dust and loose paper Twigs snap off Large branches in motion Telegraph wires whistle Walking is difficult 4 6 8 8 12 25 31 39 46 4 16 11 14 17 21 The acceptable wind speed for the free standi...

Page 6: ...having sufficient height to avoid collisions with wires ceiling devices beams etc The tower should only be moved by manual effort and only from the base Must be pushed at the bottom of the frame When...

Page 7: ...er Damage including impact of traffic or site equipment with the scaffold The scaffold inspection checklist can be follow 1 2 3 4 1 Ensure all brace claws operate and lock correctly prior to erection...

Page 8: ...owed to extend the height of the platform by the use of ladders boxes or other devices Temporary structures such as scaffolds and working platforms should be designed by a competent person or a profes...

Page 9: ...tform height for outdoor use is 8 meter Height to Basw Ratio Maximum 3 1 3 1 Maximum platform height for indoor use is 12 meter Height to Basw Ratio Maximum 3 5 1 3 5 1 The Basic Knowledge Required fo...

Page 10: ...will be transfer to the vertical aluminium elements and the bracings are added as restrain to the vertical members For the lateral load the loading will be transfer to the structure and then resist b...

Page 11: ...uppliers instruction manual will detail the maximum lads that the tower can support The safe loading Maximum Design Load supported on platform e g 275kg Maximum Design Load supported on whole tower e...

Page 12: ...ficult detaching Efficiency of assembling should under no circumstance be achieved in the expense of safety While the one hand snapping onto frames facilitates the quick and self locking assembly the...

Page 13: ...ed at a lower level than shown in the parts list table Ballast must be of solid materials i e not water or loose sand and should not be positioned to overload individual legs Ballast should be secured...

Page 14: ...the tower 5 The overall structure of the mobile access tower shall be stable Refer to the manu facturer s plan when constructing If necessary other stable equipment such as diagonal brace stabilizer s...

Page 15: ...ended it should be tied 3 For further information on tying in a tower please contact your supplier or the manufacturer Maintenance Storage 1 All components and their parts should be regularly inspecte...

Page 16: ...15 Scaffold Introduction and Guideline_TUV Single width Standard Frame Double width Standard Frame...

Page 17: ...16 Scaffold Introduction and Guideline_TUV...

Page 18: ...stable Leg Horizontal Brace Aluminum Toeboard Set Platform Trapdoor Platform 4 Rung Standard Frame 4 Rung Laddaspan 4 Rung Laddaspan 4 Rung Standard Frame Guardrail Frame Upper Guardrail Frame Lower D...

Page 19: ...Number of people required for erection and dismantling 1 people 2 metres 4 66 5 13 5 59 6 05 6 52 6 98 7 45 7 91 Code Description Weight kg CB6S 6 Castor 0 22 4 4 4 4 4 4 4 4 AL290 Adjustable Leg 3 8...

Page 20: ...rung Standard Frame 6 1 2 2 3 2 3 3 4 F1350 4L 1350mm 4 rung Laddaspan 10 1 2 2 3 2 3 3 4 F1350 5 1350mm 5 rung Standard Frame 8 5 1 1 F1350 5L 1350mm 5 rung Laddaspan 11 2 1 1 HB 2000 2000mm Horizon...

Page 21: ...missing components Damaged or incorrect components shall not be used 2 Assemble the leg and castor base plate combo and plug them into the base of frames The safety lock has to be clicked for complet...

Page 22: ...nstall 2 rung frames with the detachable handrails 10 Snap another pair of diagonal bracing in a 1 3 manner 11 Place the platform onto the designated rung level again Also make sure the trapdoor openi...

Page 23: ...e tower 6 Place the platform and trapdoor platform onto the designated rung level 7 Sitting on the platform with your legs through the trap door and your feet on the frame rungs Snap two pairs of hori...

Page 24: ...arded platform positioned above the first rung of a tower If your risk assess ment shows it necessary you may also need to guardrail platforms at this level Guardrails Transition Platform Working Plat...

Page 25: ...To take down the tower reverse the building sequence Damaged or incorrect components shall not be used Dismantling Procedure 24 Scaffold Introduction and Guideline_TUV...

Page 26: ...ort 33 20 02 Unit 02 20 F Port 33 33 Tseuk Luk Street San Po Kong Kowloon 852 2388 8116 852 2388 6830 Info welltechaerial com For further information about this product or any other products and servi...

Reviews: