TABLE OF CONTENTS
Section 01 - SAFETY INFORMATION
1.10 Caution To Prevent Injury
1.20 Caution To Reduce Risk Of Electrical Shock
1.30 Warning To Reduce Risk Of Electrocution
1.40 Danger To Reduce Risk Of Explosion Or Fire
Section 02 - INSTALLATION
2.10
Introduction
2.20
Unpacking
2.30
Pump
Mounting
2.40
Pump
Location
2.50 Intake And Discharge Provision
2.60
Electrical
Power
2.70
Vacuum
Connection
2.80
Vacuum
Gauges
2.90
Traps
Section 03 - OPERATION
3.10
Starting
Procedures
3.20
Leak
Detection
3.30 Operating Pressure Range
3.40
Shutdown
Procedures
Section 04 - MAINTENANCE
4.10
Maintenance
Procedures
Section 05 - TROUBLESHOOTING
5.10
Vacuum
Problems
5.20
Pressure
Problems
5.30 Trouble Shooting Guide For 2511 And 2515
Section 06 - SPECIFICATION
6.10
Specifi cation Table
Section 07 - WARRANTY
Section 08 - EXPLODED VIEWS AND PARTS LIST
8.10 Exploded View And Parts List For 2511B-75 / 2511C-75 / 2511C-76
8.11 Exploded View And Parts List For 1475K-20
Section 09 - KITS AND ACCESSORIES
3