
Part number 550-142-085/0712
– 71 –
WM97+
gas
-
fired
water
boiler
—
Boiler Manual
ESSENTIAL settings
THE CONTROL SETTINGS LISTED BELOW MUST BE MADE BEFORE STARTING THE BOILER
. Failure
to comply could result in incorrect operation of the boiler, causing possible severe personal injury, death or sub-
stantial property damage.
THE CONTROL SETTINGS LISTED BELOW SHOULD BE MADE BEFORE STARTING THE BOILER
. These
settings provide information about boiler start-up and service. This information will help reduce troubleshooting
time and inform technicians working on the equipment about boiler history.
CWH Installations —
Follow all instructions in the CWH manual to verify that the mixing valve is installed and
operational before proceeding further with the installation. Failure to correctly install the mixing valve and all
necessary temperature regulating devices in the system could result in severe personal injury or death.
Step 1
Read about menu access and navigation
on page 72.
Step 2
Turn OFF power to the boiler.
Step 3
Turn off gas supply to the boiler by closing
the boiler’s manual gas valve.
Step 4
Disconnect thermostat input wires to the
boiler at the low voltage terminal block.
Step 5
Turn ON power to the boiler. Turn boiler
ON/OFF switch to ON.
Step 6
Navigate to the BOILER SETTINGS /
BOILER MODEL screen.
Step 7
Read the boiler model shown on the dis-
play.
If the boiler model number shown does NOT
match the boiler, the selection MUST be changed
to the correct model number. Failure to comply
could result in severe personal injury, death or
substantial property damage.
Step 8
Navigate to the BOILER SETTINGS /
HIGH ALTITUDE screen.
Step 9
If the boiler is installed at altitude above
5,500 feet, the selection must be changed
to YES.
If the boiler is installed at altitude above 5,500
feet, the high altitude selection MUST be changed
to
YES
. Failure to comply could result in severe
personal injury, death or substantial property
damage.
Step 10
Continue with recommended settings
below.
Step 1
Navigate to the CONTRACTOR MENU /
SET DATE AND TIME screen.
Step 2
Enter current date and time by accessing
each screen and setting the data.
POWER OUTAGES
— The date and time infor-
mation will be saved for brief power interrup-
tions. For interruptions longer than 30 minutes,
the date and time information will be lost.
Step 3
Navigate to the CONTRACTOR MENU /
MAINTENANCE INFO screen.
Step 4
Verify boiler model is shown correctly.
Step 5
Input contractor name, phone, boiler CP#,
installed date and interval setting. The in-
terval setting is the time for a maintenance
reminder to appear on the display. Press
RESET REMINDER to reset the dates.
Step 6
Turn off power to the boiler. Turn boiler ON/
OFF switch to OFF. Reconnect thermostat
input wires on low voltage terminal strip.
Step 7
To adjust controls settings, proceed to the
next page. If settings are complete, pro-
ceed with start-up on page 85.
Summary of Contents for WM97+110
Page 1: ......