Part number 550-141-887/0800
12
AHE
Series 4 Direct Vent Wall-Mounted Boilers
— Boiler Manual
2c
Venting — back venting installation
Prepare mounting panel
Inside
Inspect boiler wall location for obstructing piping and
electrical supply prior to drilling and boiler installation.
Failure to do so will cause severe personal injury, death
or substantial property damage.
1.
Level and tape template to wall at desired height between wall studs
Center of mounting panel bolt holes must be in line
with 16" studs unless support board is provided. Refer
to “Wall preparation” on page 8. Failure to mount panel
properly can result in severe personal injury, death or
substantial property damage.
2.
Mark location on wall of vent/air intake opening (small rectangle in
template). Remove template.
3.
Cut opening in wall.
Outside
4.
Take the following materials outside:
a.
outside wall plate assembly (see Figure 4 on page 11).
b.
silicone sealant.
c.
level.
d.
(4) #10 x 1½" common screws (provided)
e.
(4) wall anchors (not provided), for masonry walls only.
f.
screwdriver.
g.
drill with small bit (to start screws if necessary).
5.
Using plate as template, level, locate and start mounting holes.
6.
Place a generous amount of silicone sealant around vent/air intake
opening. See Figure 5, page 11.
7.
Insert outside wall plate assembly into opening and attach to wall.
Summary of Contents for AHE Series
Page 1: ......