Part number 550-141-887/0800
10
AHE
Series 4 Direct Vent Wall-Mounted Boilers
— Boiler Manual
6.
Determine boiler location. See Manual Section 2a
on page 8 and “Select location” on page 9.
Before installing boiler and venting,
inspect wall locations for
obstructing piping and electrical
supply. Failure to do so will result in
severe personal injury, death or
substantial property damage.
7.
Level and tape mounting panel template to wall at
desired height between studs.
Center of mounting panel bolt holes
must be in line with 16" studs unless
extra support board is provided.
Refer to “Wall preparation” on page
8. Failure to mount panel properly
can result in severe personal injury,
death or substantial property
damage.
8.
To locate side wall vent:
a.
Measure from floor to center line of top
exhaust tube on large template.
b.
Subtract ¼" per foot of vent run from step “a”.
Vent tubes must pitch down from boiler.
c.
Level and tape small template on side wall.
Height of top exhaust center line is distance in
step “b”. Note correct “up” position for right
or left side venting.
9.
Mark location of vent/air intake opening through
template on side wall.
10. Remove template and cut opening in wall.
Outside
11. The following material is required:
a.
outside wall plate assembly (see Figure 4 on
this page and Figure 8, page 11).
b.
silicone sealant.
c.
(4) #10 x 1¼" common screws (provided) or
(4) wall anchors (not provided) for masonry
wall only.
d.
screwdriver.
e.
drill with small bit (to start screws if necessary).
f.
level.
12. Using outside wall plate as template, level and locate
mounting holes.
13. Place a generous amount of silicone sealant around
wall opening. See Figure 5, right and Figure 8 on
page 11.
14. Insert outside wall plate assembly into opening and
attach to wall.
2b
Venting — side venting installation
con’t
Prepare mounting panel
continued
Figure 6
Measure tube lengths
Figure 5
Silicone sealant
Figure 4
Outside wall plate assembly
“UP”
88704
Silicone
sealant
88705
Opening
Exhaust tube
cutlines on template
Large template
Take
measurement
from birdguard
inside both
openings
88707
Summary of Contents for AHE Series
Page 1: ......