![Weil-McLain 550 MBH Nstallation And Operation Manual Download Page 82](http://html1.mh-extra.com/html/weil-mclain/550-mbh/550-mbh_nstallation-and-operation-manual_952622082.webp)
Part number 550-100-168/0516
82
SlimFit
®
Series 3
COMMERCIAL
CONDENSING
GAS
-
FIRED
WATER
BOILER
—
Boiler Manual
MAINTENANCE, DATE AND TIME menus
&IGURE
-!).4%.!.#%$!4%!.$4)-%
menus — navigation (see Figure 58, page 70 for access information)
MAINTENANCE INFO
1. Use this section to enter contractor’s information, CP number, install date and to enter an automatic notice for maintenance (de-
fault is 12 months). Because this shows on the display, it is an automatic means of notifying the homeowner of need for scheduled
maintenance by the technician. Select RESET REMINDER to reset for the next maintenance date.
SET TIME AND DATE
1. Enter current date and time. This allows correct maintenance reminder timing and provides date and time stamp for lockout
histories on ERROR screen in Diagnostic Menu.
-AINTENANCE)NFO
#OMMENT
Name
Contractor name to appear in maintenance reminders and during lockouts
Phone
Contractor phone number
Model
Displays the boiler model selected in the boiler setup
CP Number
Enter the CP# of the boiler
Installed
Enter the date the boiler was installed
Last Date
Date automatically entered when Reset Reminder is chosen by contractor
Next Date
Date automatically calculated when Reset Reminder is selected by contractor
Interval Settings
Contractor selects maintenance reminder frequency based on service history
Reset Reminder
Contractor selects this to update Last maintenance Date and Next Date. Homeowner uses this to ignore the reminder and
update only the Next Date.
3ET4IMEAND$ATE
Year
Set year (homeowner or contractor)
Month
Set month (homeowner or contractor)
Day
Set day (homeowner or contractor)
Hour
Set hour (homeowner or contractor)
Minute
Set minute (homeowner or contractor)