Install burner (also refer to instructions
packed with burner):
Burners designed for use with
Weil-McLain 68 boilers
must not
be
used on GOLD Oil boilers. Contact individual burner
manufacturers for GOLD Oil applications.
For
P-SGO
and
A-SGO
boiler:
1. Secure universal mounting flange and gasket to
burner mounting door. Use three bolts provided.
2. Secure burner on flange with three bolts.
3. Position burner so end of air tube is level to
1½° tilt down toward chamber. Open door to
verify burner position. End of air tube should be
flush to ¼" recessed from inside wall of burner
door refractory. Check for secure placement of
insulation on target wall, chamber floor and
burner mounting door. Securely close door.
Install Packaged and Non-Packaged Boiler
Summary of Contents for 550-141-829/1201
Page 9: ...Install Non Packaged Boiler CONTINUED ...
Page 11: ...Install Packaged and Non Packaged Boiler ...
Page 15: ...Connect Steam Piping CONTINUED ...
Page 16: ...Connect Steam Piping CONTINUED ...
Page 20: ...20 Connect Wiring CONTINUED ...
Page 22: ...22 Connect Wiring CONTINUED ...
Page 29: ...Parts Drawing ...
Page 31: ...Dimensions CONTINUED ...
Page 32: ......