上海维宏电子科技股份有限公司
SHANGHAI WEIHONG ELECTRONIC TECHNOLOGY CO., LTD.
10
/
36
2
Commissioning
This section mainly introduces operations to quickly do commissioning for
Double-
tool CNC System
.
The process for commissioning is as follows:
1.
2.
3.
4.
5.
6.
Confirm machine coordinates of double tools
7.
If there is no special instruction, the above operations are executed in
Technician
interface, and manufacturer permission is required.
2.1
Clear I/O Port Alarms
This operation is used to clear I/O port alarm so as to establish good communication
between the system and the servo drive.
Common I/O port alarms are as follows:
•
•
•
To modify port polarity, see
Execute I/O Port Related Operations
for details.
2.1.1
Clear the E-stop Alarm
To clear the E-stop alarm, check if
E-stop
button is pressed:
•
If it is, release the button.
•
If it is not, modify the polarity of port
E-stop
.
2.1.2
Clear the Limit Alarm
When the machine tool triggers the limit switch, the system will send a
positive/negative limit alarm.
To clear the limit alarm, move the machine tool towards the opposite direction of
the limit switch.