
12
13. Route the Arm Cable (54) over a V-pulley (46).
Attach the V-pulley, a Large Cable Trap (50), two
Full Guards (41), and an M10 Washer (57) to the
Upright (3) with an M10 x 63mm Bolt (75) and an
M10 Locknut (56). Make sure that the Cable Trap
is oriented to hold the Arm Cable in the groove
of the V-pulley.
15. Route the Arm Cable (54) over a V-pulley (46).
Attach the V-pulley, a Large Cable Trap (50), two
Full Guards (41), and an M10 Washer (57) to the
Upright (3) with an M10 x 63mm Bolt (75) and an
M10 Locknut (56). Make sure that the Cable Trap
is oriented to hold the Arm Cable in the groove
of the V-pulley.
14. Route the Arm Cable (54) under a 90mm Pulley
(48). Attach the Pulley and two Half Guards (43)
to the Double U-bracket (63) with an M10 x 46mm
Bolt (81) and an M10 Locknut (56). Make sure
that the Half Guards are on the outside of the
U-bracket as shown.
56
3
57
46
50
75
54
41
15
48
43
43
63
81
56
54
56
3
57 46 50
41
75
54
41
13
41
14
Summary of Contents for WESY1938C.0
Page 4: ...4...