11
12. Pull the upper cable (B), which is attached inside
of the Mech Assembly (6), up between the
Upright (3) and the Pulley Plate (18).
Attach another Large Pulley (17) between the
Upright (3) and Pulley Plate (18) with an M12 x
62mm Button Bolt (80) and an M12 Nylon
Locknut (72).
Make sure that the upper cable
(B) is between the two Pulleys.
Hold the 1 1/2” Spacer (54) inside of the loop of
the upper cable (B), and between the Upright (3)
and the Pulley Plate (18). Attach the Spacer with
a 3/8” x 2 1/4” Screw (85).
Make sure the ends
of the cable do not wrap around each other
below the Spacer and the Large Pulleys (17)
used in steps 11 and 12 (see the CABLE DIA-
GRAM on page 18).
Tighten the M12 Nylon Locknuts (72) used in
steps 11 and 12.
13. Attach a Small Guide Spacer (56), a Large Guide
Spacer (57), and two Bar Guides (55) to the Lat
Tower (5) with a 3/8” x 6” Bolt (83).
Do not tight-
en the Bolt yet.
Pull the upper cable (B) up between the Bar
Guides (55). Press the metal cover on the cable
into the groove in the Block Spacer (58). Attach a
Small Guide Spacer (56), the Block Spacer, the
two Bar Guides, a 3/8” SAE Washer (75), and the
two Tethers (61) to the Lat Tower (5) with another
3/8” x 6” Bolt (83).
Do not tighten the Bolt yet.
14. Insert the Resistance Bar (9) between the Bar
Guides (55), and center it on the Block Spacer
(not shown).
Press a Pulley Bracket (10) onto the Resistance
Bar (9). Attach a Tether (61) to the Pulley Bracket
at the upper hole, with a 3/8” x 2 3/4”
Bolt (93), a
3/8” SAE
Washer (75), and a
3/8”
Nylon Locknut
(73).
Repeat on the other side of the Resistance
Bar (9). Then, tighten the 3/8” x 6” Bolts (83)
used in step 13.
15. Hold a Large Pulley (17) inside of the upper cable
(B). Attach the Pulley to a Pulley Bracket (10)
with an M12 x 58mm Button Bolt (81) and an M12
Nylon Locknut (72).
Make sure that the cable is
routed as shown in the CABLE DIAGRAM on
page 18.
80
3
6
17
18
72
54
85
B
12
56
56
58
61
73
75
10
93
10
72
81
17
B
9
55
61
75
83
83
B
Metal
Cover
55
5
55
57
13
14
15