Operation and Maintenance Manual of WP13C Series Diesel Engines                                                                                                                              

Weichai Power Pursuit of Excellence 

- 11 - 

2. Major works during diesel engine check and maintenance 

Table 4 Work during diesel engine maintenance

 

 

Work item

 

 

Initial check

 

Routine 

check

 

WD1

 

WD2

 

WD3

 

 

WD4

 

Change the diesel engine oil

 

 

 

Water pump leaking?

 

 

 

 

Replace the oil filter

 

 

Every time when change the oil

 

Check and adjust the valve 

clearance

 

 

 

 

 

 

 

 

 

Replace the fuel filter

 

 

 

 

Clean the coarse strainer of 

fuel pump filter

 

 

 

 

 

 

 

 

Check the coolant capacity 

and add if insufficient

 

 

 

 

 

 

 

 

 

Fasten the coolant pipe clamps

 

 

 

 

 

 

Fasten the air inlet pipes and 

hoses

 

 

 

 

 

 

 

 

Clean the filter element of air 

filter

 

 

 

 

 

 

 

 

Check and fasten the V-belt

 

 

 

Check the fuel injection pump 

in the special workshop

 

 

 

 

 

 

 

 

Adjust the idle speed

 

 

 

 

 

 

 

Note: 

 Mark for items requiring maintenance

   

3. Daily maintenance of diesel engine 

3.1 During diesel engine running, pay attention to the oil temperature, oil pressure and outlet water 
temperature, and check for leakages (oil, water, gas). In case of any abnormality, find out the causes 
immediately and troubleshoot timely. 
3.2 After shutdown of diesel engine, check the capacity of fuel, coolant and oil, and add to the specified 
level if insufficient. 
3.3 Drain the water in primary fuel filter. 
3.4 Check the tension of drive belt and adjust as necessary. 
3.5 If the environment temperature may be below 0 and no antifreeze is used, 

℃ 

drain the coolant empty 

to protect the diesel engine parts against frost cracking. 

4. Maintenance during long-term shutdown of diesel engine 

4.1 Oil seal method 

Add anticorrosive agent in the lubricating oil of lubricating system. Carry out preparations before starting 
for diesel engine normal running. Stop the engine after running for 5~10min, add oil seal oil for fuel system 
by using a clean container, remove the original fuel inlet pipe of diesel engine, insert it into the container, 
and eliminate the air in the fuel system. Start the diesel engine, run it for 15min at 2/3 of rated speed, and 
then stop it to let the starting motor drive the diesel engine for running. Use the high pressure spray gun 
filled with intake/exhaust pipe oil seal oil to spray the oil seal oil toward the inlet of supercharger until the 

Summary of Contents for WP13C450-18

Page 1: ...Operation and Maintenance Manual of WP13C Series Diesel Engines Weichai Power Pursuit of Excellence Operation and Maintenance Manual of WP13C Series Diesel Engines Weichai Power Co Ltd...

Page 2: ...shall not disassemble them Otherwise the warranty will be invalid The supercharger rotor shaft is of precise and high speed rotating part it is prohibited to disassemble or collide it Otherwise the wa...

Page 3: ...stopping if the ambient temperature may be below 0 and there is no antifreeze additive please drain the water in the water tank and the diesel engine 6 Do not operate the diesel engine which is not eq...

Page 4: ...e performance operation test operation and maintenance With the continuous development of production and technology the structure will be further improved and users are reminded of the possible incons...

Page 5: ...cating system 4 3 Fuel system 4 4 Cooling system 7 5 Electrical equipment 8 Chapter IV Maintenance of WP13C series diesel engines 10 1 Maintenance interval of WP13C series diesel engines 10 2 Major wo...

Page 6: ...Operation and Maintenance Manual of WP13C Series Diesel Engines Weichai Power Pursuit of Excellence 1...

Page 7: ...6 2 4 Fuel supply advance angle CA 15 ICXN rated power speed 330kW 1800r min ION overload power speed 363kW 1858 r min Total displacement of piston L 12 54 Minimum stable operating speed r min 810 Idl...

Page 8: ...nd valve mechanism 1 1 Gear train diagram The WP13C series diesel engines adopt the rear mounted gear train figure2 1 in which the gear chamber and the flywheel housing are integrated in order to redu...

Page 9: ...series diesel engine so it is prohibited to use any oil additives Table 2 Lubricating oil grade selection Caution For WP13C mechanical pump series diesel engine it is not allowed to use grade CH and...

Page 10: ...facturing and mounting quality and the fuel quality used influence the performance and reliability of diesel engine The user s fuel tank shall be clean free of rust and corrosion and there shall be no...

Page 11: ...random mounting will cause improper stress lateral force generated by fuel inlet joint will bend the fuel injector on the fuel injector and this is very dangerous Learned from previous practices tight...

Page 12: ...ling the oil and the diesel engine and ensuring continuous work at the suitable temperature The cooling circulation is divided into long circulation and short circulation When the diesel engine water...

Page 13: ...end See figure 2 9 for generator circuit diagram Pay attention to the following when installing and connecting the geneartor Cool completely Prevent dust splashing and oil Check the generator belt ten...

Page 14: ...iesel engines can be matched with SAE I flywheel housing and gear case for generation When mounting the coaxiality of diesel engine crankshaft and gear case input shaft must be ensured The diesel engi...

Page 15: ...lings must be used for connecting and mount the couplings according to alignment accuracy of different couplings During operation correct the coaxial accuracy regularly to ensure coaxiality of couplin...

Page 16: ...ality find out the causes immediately and troubleshoot timely 3 2 After shutdown of diesel engine check the capacity of fuel coolant and oil and add to the specified level if insufficient 3 3 Drain th...

Page 17: ...r the user shall pay attention to that the oil seal period of diesel engine is 1 year after this period please check and take necessary supplement measures c Rotate the flywheel and spray solvent into...

Page 18: ...ng in period of diesel engine run it with medium load and below c Do not run at idle speed for a long time or it may cause faults such as oil leaking d During normal operation of diesel engine continu...

Page 19: ...ery electrolyte level viscosity and unit voltage If the diesel engine is not used for a long time and the temperature is very low please take down the battery and store it in a warm room f Shutdown Wh...

Page 20: ...he joint and sealing of the fuel pipe if the screw is tightened and release the air 3 Fuel pump does not work Examine the piston and valve of feul delivery pump clean or repair them 4 Poor quality fue...

Page 21: ...pipe replace the fuel 4 Leakage with fuel pipe Inspect and repair it 5 Poor atomization of injector nozzle Inspect the injection pressure carbon deposits on the nozzle adjust and repair it 6 Poor tim...

Page 22: ...fails Change 3 Oil pan high level or surplus oil Inspect and drain a proper amount of oil 8 Unstable speed Reason How to remove 1 Poor quality fuel containing water and wax Washing fuel pipe and chan...

Page 23: ...low level or insufficient oil Inspect the oil level and if there is any leakage if so add oil 4 Oil brand and grade are unqualified Replace by specified oil grade and brand 5 Oil channel blocked Clea...

Page 24: ...ails Reason How to remove 1 Undercharged battery Inspect charge and replace the battery 2 Poor wire connection Inspect and tighten the terminal 3 Fuse broken Replace the fuse 4 Electric brush poor con...

Page 25: ...lace the battery Chapter VI List of Wearing Parts of WP13C series diesel engines Part number Name Quantity per unit Remarks 61270040018 Cylinder head gasket 6 61560110210 Turbocharger gasket 1 6126301...