5.2. Alignment of unit section
-
The individual sections must be aligned with each other both vertically and horizontally.
-
The distances between adjacent sections must be as small as possible.
Note!
-
When moving the unit sections into position, never apply force to the heat exchanger
connections, panelling or other mounted parts. Always move the unit by its base frame.
-
Never attempt to move the unit sections using a hammer or other heavy implement. Unit
elements placed on the foundation must only be shifted but not lifted.
-
To position the unit sections / component properly, we recommend using rods as levers
acting on the base frame.
5.3. Connection of unit sections
5.3.1. Connection with external corner brackets
Connect the corners of the unit elements with the supplied corner brackets and M10 x 20 Allen
head screws. Top corner brackets are not required for units with a weatherproof roof.
For the connection of the unit elements at the base frame, use the supplied M8 x 30 or M10 x
30 hex head screws. No brackets are used at these points.
Summary of Contents for DIWER EVO DP80 Series
Page 2: ......
Page 39: ...Installation and Operating Manual Page 37 Printed 02 2015...
Page 62: ...Installation and Operating Manual Page 60 Printed 02 2015 Notes...
Page 63: ...Installation and Operating Manual Page 61 Printed 02 2015 Notes...
Page 64: ...Installation and Operating Manual Page 62 Printed 02 2015 Notes...