24
espresso coffee machine - user instructions
English
3.
PREPARATION OF THE MACHINE
The preparation of the machine and its installation must be carried out by qualified personnel.
4.
ACTIVATION OF THE MACHINE
4.1
ELECTRIC POWER SUPPLY
The connection of the machine to the electrical mains must
be carried out by qualified personnel only.
4.2.2 CONNECTION TO THE NETWORK HYDRAULICS (OPTIONAL)
If the machine is ready, the connection to the hydraulic network,
be made only by qualified personnel.
4.2.1 WATER SUPPLY WITH INTERNAL TANK
• Turn the key and open the door
(A)
;
• fill the tank
(B)
with potable water;
• close the door with the key.
C
A
B
Use of the machine without all the installation operations having been carried out by technical
personnel could damage it seriously.