L12
–
User manual
–
English (EU/USA)
–
15/01/2020 - ISSUE 4
19
11
Shut-down procedure
Upon completion of work, or when taking a long break (more
than 10 minutes), the unit must be shut down correctly:
➢
Switch boiler OFF
•
The switch will no longer illuminate green.
➢
(Optional - recommended) Keep lance trigger pressed
ON to cool boiler
•
As the boiler cools, the main green light will go
off.
•
Wait until temperature on thermostat drops
below 60C/140F.
•
Water will be flowing from lance.
➢
Turn the engine OFF
•
The whole machine turns off.
➢
Close the valve to the main water tank
You can also shut the machine down by turning the engine
off directly, without waiting for the boiler to cool down.
12
Basic fault finding
The table below lists basic faults which can be diagnosed and
rectified by a competent L12 operator. Please refer to the
training documentation provided during training.
BEFORE BEGINNING ANY WORK ENSURE THE
WEEDINGTECH L12 HAS BEEN
SWITCHED OFF
.
WARNING: WATER IN THE L12 MAY BE HOT
.
THE L12 SHOULD BE SWITCHED OFF AND CHECKED
BY A COMPETENT SERVICE ENGINEER IF THE
OPERATOR IS UNABLE TO DIAGNOSE AND RECTIFY A
FAULT USING THE TABLE BELOW, OR IF A FAULT
PERSISTS.
Summary of Contents for Foamstream L12
Page 1: ...EPA Est No 94946 GBR 1 USER MANUAL For L12 019 and above ENGLISH EU USA 15 01 2020 ISSUE 4...
Page 2: ...L12 User manual English EU USA 15 01 2020 ISSUE 4...
Page 5: ...L12 User manual English EU USA 15 01 2020 ISSUE 4 5...
Page 27: ...L12 User manual English EU USA 15 01 2020 ISSUE 4 15 Schematics Figure 10 L12 P ID...
Page 28: ...L12 User manual English EU USA 15 01 2020 ISSUE 4 28 Figure 11 Wiring diagram rev 1 2...
Page 29: ...L12 User manual English EU USA 15 01 2020 ISSUE 4 29 Figure 12 Electric diagram rev 1 2...