WECO 5K3 LV/HV
65
3.5.2
DATA Connections (Example of 12-Modules)
Step1
: Set up the DIP Switches as per the picture below.
Step 2
: Connect the CAN and Link ports, starting from the HV Box port CAN A and LINK, then chain connection as
shown below.
The HV Box must be set up before turning it on. The DIP addresses must follow the picture below to enable the CAN
communication. The last module of the series must be terminated by addressing the module as shown in the picture to end the
CAN line.
HV Box Battery Module End of series
Summary of Contents for UNIVERSAL 5K3HV
Page 70: ...WECO 5K3 LV HV 70 3 6 HV Box ADDRESS...
Page 75: ...WECO 5K3 LV HV 75...