103160_SHB_Rev2.1_080611
MPE 750 Turbo Marine
Closed Loop
8
1
3
5
6
4
2
7
10
9
4
3
2
4
Service Manual
Page 27
3)
Unscrew the valve cover (2) along
with bracket and valve (3).
Tightening torque:
10 Nm ± 10 % [7.4 ft. lb.]
Replace the valve cover seals
(4).
Clean seal areas of the valve
cover and cylinder head.
The sequence of the connection
occurs according figure.
Assembly occurs in reverse order. Please note instructions after this
symbol
Removing the valve cover (continuation)