12.2.4
Installing and assembling
When positioning and installing the generators, please ensure that the following
conditions are met:
Sufficient air circulation
The air inlets are located on the underside of the housing
Installation of the generator in a vertical positon with the front fan facing
downwards
Installation of the generator in a horizontal position with the the cooling
profile pointing upwards
The following must be observed for installation and assembly:
only suitable, instructed and expressly authorised persons may carry out
the work,
for installation or integration of the ultrasonic generator into a total system,
the data in the installation drawing must be observed.
1.
Install the individual ultrasonic generators/components in line with the
installation plan.
2.
When fitting third party components, the manufacturer's instructions
must be observed.
3.
Make sure that all screwed joints and connections are properly and
firmly fastened.
The
ultrasonic generator is fitted.
NOTE
When assembling the equipment, please make sure you check the
components for completeness (for example, vibration-absorbing and
protective padding provided by the manufacturer should be inserted
in the clamps again).
All isolating and contact points (HF cables, mains cables, control
cables) must be checked and, if necessary, tightened. Cables should
never be kinked.