- Put the soil compactor out of operation as described in paragraph
2.7.
- Lock the handle (2/1) with the locking lever (2/2).
- Lift up the soil compactor at the protection frame with the help of
a second person.
Figure 2
Figure 3
1
2
1
2.2 Transport
Short distances on the job site can be covered by the compactor
under its own power in accordance with paragraph 2.6.
For transporting the compactor over long distances, however, the
machine can be transported by means of a special undercarriage
(refer to paragraph 2.4.4). In addition, the machine can be lifted on an
appropriate transport vehicle (truck, trailer) with a crane.
2.2.2 Manual Loading
2.3 Commissioning
Caution!
For commissioning, only carry out the pre-start work described in paragraph 2.4. Keep to the initial maintenance
intervals (refer to paragraph 3.2.1).
2.2.1 Loading by Crane
- Put the soil compactor out of operation as described in paragraph
2.7.
- Lock the handle (2/1) by means of the locking lever (2/2).
Danger!
Never use the handle (2/1) for lifting the machine by crane.
The machine may overturn!!
- Put the crane hook into the protection frame (3/1).
Danger!
Only use a lifting tackle and a crane of a sufficient bearing
capacity.
- Lift the soil compactor on the transport vehicle.
Danger!
Do not enter the zone under the suspended load!
2.4 Pre-Start Work
- Check to ensure that all safety devices are in place. Check the whole soil
compactor for evident damage (visual check).
- Check all screwed connections for tight seat, retighten them if necessary.
- Check the fuel level, if necessary, top up fuel (refer to paragraph 2.4.1).
- Check the engine oil level, if required top up engine oil (refer to
paragraph 2.4.2).
- If desired, fit the damper plate (refer to paragraph 2.4.3).
CF-2
11
- If the water sprinkler system is installed, check
the water level and top up the tank with clean
water if required (refer to paragraph 2.4.5).
- If desired, fit the undercarriage (refer to paragraph
2.4.4).