103666_EBH_Rev1.0_080215
MPE 750 Turbo Marine
Closed Loop
Installation Guide
Page 1
1 Mechanical
Installation
The following section describes the handling of the engine during installation and the assembly into the boat.
In general a clearance of 50 mm between engine and boat hull is required.
Vent openings of an area of 9000 m² is needed to give the engine enough air to operate.