![Webasto Thermo Top C Parking Installation Documentation Download Page 18](http://html1.mh-extra.com/html/webasto/thermo-top-c-parking/thermo-top-c-parking_installation-documentation_948106018.webp)
Suzuki Splash
1314128B_EN
18
Drill out perforated bracket
2
to 10 mm dia. at
position
3
.
1
Silent block, flanged nut
Preparing
perforated
bracket
1
Hose section [2x], 10 mm dia. clamp [2x]
2
Rubber-coated p-clamp, metering pump,
flanged nut
3
Perforated bracket
4
Silent block
Premount-
ing meter-
ing pump
Route fuel line and wiring harness of meter-
ing pump in corrugated tube
1
along original
vehicle fuel line to fuel standpipe and secure
with cable ties.
Installing
lines
1
Metering pump
2
Original vehicle bolt
Installing
metering
pump
38
3
1
2
39
1
2
4
1
3
40
1
41
1
2