Air Top 2000 S
Fuel supply
53
8.4.1.
Connecting two pipes with a hose
The correct procedure for connecting fuel lines with hosing is shown in
Figure 14.
Ensure that there are no leaks.
8.5.
Dosing pump
The metering pump is a combined delivery, metering and shut-off
system and is subject to certain installation criteria (see Figures 9, 15
and 16).
8.5.1.
Installation location
It is advisable to install the metering pump in a cool place. The maximum
ambient temperature must not 20°C at any time during
operation.
The metering pump and fuel lines must not be installed within range of
the radiated heat from hot vehicle parts. A heat shield must be used if
necessary.
Fig 14:
Pipe / hose connection
Clip
Bubble
Correct
Wrong
Bubble
Fig 15:
Metering pump DP 2
Installation position and attachment
Fig 16:
Metering pump DP 30
Installation position and attachment
Air Top 2000 S. 12 Volt – petrol
Preferably
15° - 90°
Air Top 2000 S-D. 12 Volt und 24 Volt – diesel
Summary of Contents for Air Top 2000 S-B