4
Phase Two
Luminaire Installation, Electrical Connection, and
Aiming Procedure
4) Switch off mains electrical supply.
5) Check that rating shown on luminaire label conforms
with mains electrical supply.
6) Remove screws
M
from mounting ring
H
.
7) Use sealable junction box
J
to connect luminaire
cable
N
to mains supply cable
O
(for individual
wiring or branch cable through wiring). Follow the
sealable junction box termination instruction
included in the packaging.
8) Remove cover
A
and lens/gasket assembly
B
by
loosening screws
D
.
9) Set cables and sealable junction box
J
inside
installation blockout
L
.
10) Place luminaire housing
C
into installation block-
out/mounting ring assembly
L/H
. Secure luminaire
with mounting ring
H
by tightening screws
M
.
Warning:
When luminaire is placed inside installa-
tion blockout
L
, ensure there is no stress on seal-
able junction box
J
or electric cables (Fig. IV).
11) Switch on mains electrical supply to ignite the
factory-installed LED.
Rotate and tilt the gimbal optic
12) Insert a standard tool into one of the radial cavities
of wheel
W
. Rotate wheel
W
in the direction of the
'OPEN' mark until the gimbal optic can freely rotate
and tilt
(Fig. V).
To rotate the gimbal optic
(360° rotatable)
a) Grasp both sides of catching ribs
E
.
b) Rotate gimbal optic to the desired orientation
(while observing the degree on protractor scale
G
).
To tilt the gimbal optic
(swivel-tilted 0-20°, 2° steps)
c) Insert a standard tool into hole
T.
d) Tilt gimbal optic to the desired orientation (while
observing the degree on protractor scale
U
).
13) Insert a standard tool into one of the radial cavities
of wheel
W
. Rotate wheel
W
in the direction of the
'LOC
.
' mark until the gimbal optic is
Ƃ
rmly secured
(Fig. V).
Warning:
Do not apply more torque than required
to
Ƃ
rmly secure the gimbal optic.
14) Ensure that all surfaces are clean and dry.
Reposition cover
A
, lens/gasket assembly
B
and
screws
D
on luminaire housing
C
.
15) Leave the LED ignited for approximately 30 minutes
to allow any moisture to evaporate (do not tighten
screws
D
).
Attention:
Do not switch off LED before luminaire
is properly sealed.
16) Tighten screws
D
(in a criss-cross pattern) until all
screws are properly seated and secured. Repeat
tightening procedure, again in a criss-cross pattern,
for another two rounds with a torque of 3 Nm.