We Care Solar | Jan 2019
Installation Planning
After Installation
Installation Day
Leave early
Avoid working in the hot
afternoon sun. Leave time
for unexpected delays.
Teach healthcare workers
Train healthcare staff on
how to use and maintain
the Solar Suitcase
Complete paperwork
Please take the time to
complete the necessary
paperwork
Review final
installation checklist
Checklists reduce
errors – use them!
Take photos
Take photos of installation.
Show us your good work!
Depart prior to dark
Re-organize tools
and load vehicle
Arrive and introduce
yourselves to the person
in charge of the clinic
Take a tour of the clinic
with the medical team
Plan the installation
Ask healthcare workers to
show you where they do
procedures to determine
the best place to install the
lights and Solar Suitcase
Organize team
Assign responsibilities
to roof lead, ground lead,
and teaching lead
Clean up the site
Take away debris
and re-organize any
furniture moved
Complete installation
Review installation
checklist for solar panel,
Solar Suitcase, lights,
and last steps
05