Operation manual Soldos - SL (04-09)            page 13 of 18 

 

7. Disinfection instruction 

 

 

The disinfection has to be done at every exchange of the brine bag, 

at least monthly (Before the initial operation, the disinfection has 
to be done as well) 
 
The disinfection has to be done preferably before or after the 
operation when no bathers are in the room!

 

 

A disinfection tablette is always included in delivery! 
 

 
Disinfection: 

 

Step 1: 
Wash out the empty politainer by drinking water, fill up the 

measuring bottle (200 ml) by cleaned water und add one tablet. 
Lock up the measuring bottle and shake it until the tablet is 

solubilized. 

 
Step 2: 

Fill in the brine solution into the empty, cleaned politainer and draw up the 
politainer again. 

 
Step 3: 

Draw up the nozzle adaptor on the nozzle in the room (PVC 

compact with PE downpipe hose) in order to receive the 
disinfection and brine solution. By using the downpipe hose, 

pipe the solution directly into the gully if possible.  
This is to avoid that the solutions are atomized within the 

room. 

 
 

Step 3.1 

 

Before starting the disinfection, the dosing performance of 

the hose pump has to be upgraded to the highest  

performance in order to assure a complete fllling of  
the hose pipe. 

 
 

Step 4: 

Switch on the programme „disinfection“. The pump is 
dosing the solution for 4 minutes now. Within this time, 

all parts are filled with disinfection solution. Afterwards, 
the Soldos is disabled for 11 minutes, in order to provide 

the disinfection solution enough residence time. 

Meanwhile, the LED for both disinfection and flushing is 
lighting. 

  
 

 

Summary of Contents for SOLDOS-SL

Page 1: ...om have to be checked on their corrosion resistance against the saline mixture of water and air both in the adequate steam cabinet and additional and discharged air shafts 2 Use only pure disinfected...

Page 2: ...Operation manual Soldos SL 04 09 page 2 of 18...

Page 3: ...the nozzle 7 5 Installation of the push button option 8 6 1 Attaching the brine reservoir to the unit 9 6 2 Operation modes 10 6 2 1 Interval operation continuous dosing 10 6 2 2 Push button operatio...

Page 4: ...ntamination of brine solution with germs of the ambient air The peristaltic pump conveys the brine solution to the two component jet nozzle where it is nebulised and blown into the room by the additio...

Page 5: ...al console for 5 l brine bag Politainer Two component jet nozzle stainless steel with cover screen and grommet Empty switch Measurements H580 x W630 x D250mm Dosing performance max 3 2 l h in continuo...

Page 6: ...ousing Attention please use only pure disinfected WDT brine with a salt concentration of app 5 The SOLDOS has to be installed on a capable place next to the accordant cabinet but not directly on the b...

Page 7: ...nozzle Now the cover screen is put onto the mounting sleeve and fixed with the incl screws When connecting the hose connections please consider that the compressed air piping and the brine dosing tub...

Page 8: ...on option Optionally the SOLDOS SL can be operated with a push button that has to be ordered separately As an option there are also bonnets for the different push buttons available In the following yo...

Page 9: ...on a middle position pause time 4 minutes spraying time 25 seconds Starting from this values the times have to be adapted according to the basic conditions at the point of use measures of the room ste...

Page 10: ...he unit is switched off Put the programme switch on continuous dosing The LED continuous dosing shines Adjust now the spraying and the pause time Example pause time 4 minutes spraying time 20 seconds...

Page 11: ...ings The single operation parameters can be adjusted at the front plate of the SOLDOS SL Dosing performance in l h during continous operation This stepless Poti is to set the dosing performance of the...

Page 12: ...test all functions components of the SOLDOS SL Cycle in minutes for push button operation programme switch This switch has several functions 1 Choice of the operation mode see page 10 point 6 2 2 Act...

Page 13: ...itainer and draw up the politainer again Step 3 Draw up the nozzle adaptor on the nozzle in the room PVC compact with PE downpipe hose in order to receive the disinfection and brine solution By using...

Page 14: ...sh out the disinfection concentration Step 5 1 After the rinsing process the dosing performance of the hose pump has to be reseted to the performance before the disinfection process Step 6 Remove the...

Page 15: ...ntle pumping action with accurate flow rates The pump is self priming and can run dry The pump is quiet running and very simple to handle 8 2 Changing the dosing hose For transport and storage the per...

Page 16: ...clean the air filter of the compressor monthly When the unit is taken out of operation we recommend a flushing of the whole system with distilled water to prevent incrustations Afterward take out the...

Page 17: ...Operation manual Soldos SL 04 09 page 17 of 18 10 Wiring diagramme...

Page 18: ...TFE 4x1mm 1m 10435 Dosing tube PE 6 x 1mm 1m 17437 Canister coupling for Soldos 13557 Pump gear motor Sa 14140 Pump housing Sa blue 13039 Pump roller Sa blue 13633 pump safety disc blue for roller Sa...

Reviews: