![WCT TUF-Lugger Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/wct/tuf-lugger/tuf-lugger_operating-instructions-manual_878955022.webp)
Installation of the Load Monitor requires a screwdriver and two 3/4” wrenches. Once
installed, the Load Monitor can be left in place permanently.
Install the load cell locator plate and
load cell into the frame with two ¼”-20
button head screws as shown.
F1
Install the Load Cell Compression plate
overtop of the load cell with the ¼”-20
socket head cap screws provided as
shown. The rope should ride on top of
the compression plate.
F2
For detailed bracket installation, operation, App installation, and usage guidelines, follow
the 40000-270 operating instructions and Load Monitor Quick Start Guide provided with your
unit.
F3
A
C
C
ES
S
OR
IES
19