GreyT Elevator V3 - User Guide
(Rev 1)
Page 29
wcproducts.com
Step 18
Bolt the 3/4” OD radial bearings into the bearing blocks on the backside of the 1st stage
and the front side of the elevator mast. The bearing blocks where they must be installed
are indicated in green in the image below.
At this point, the 1st stage should be able to move smoothly up/down, and a small
amount of wiggle left/right and front/back is to be expected. This ensures the elevator
will not bind.