5-3.Installation:
(1) Always
Keep proper footing & balance while moving this 430kgs machine. And
only use heavy-duty fiber belt to lift the machine as per Fig. (A).
(2) Hang the machine up, away from the floor, take away the 4 pads and assemble
them on the auxiliary stand. Fix the machine on the auxiliary stand and lock the
connection nut.
(3)
Finish
removing this wooden case / crate from
the machine. Unbolt the machine from the crate
bottom.
(4)
Position
& tighten 4 bolts into base holes
properly after machine in balance.
(5)
Turn off
the power before wiring & be sure
machine is in proper grounding. Overload &
circuit breaker is recommended for safety
B Fig. A
wiring.
(6)
Keep
machine always out from sun,
dust, wet, raining area.
5-4.CLEANING & LURICATING
(1) Your machine has been coated with a heavy grease to protect it in shipping.
This coating should be completely removed before operating the machine.
Commercial degreaser, kerosene or similar solvent may be used to remove the
grease from the machine, but avoid getting solvent on belts or other rubber
parts.
(2) After cleaning, coat all bright work with a light lubricant. Lubricate all points
in Fig 1. with a medium consistency machine oil.
6.MINIMUM ROOM SPACE FOR MACHINE OPERATION
116”
115
”
78”
8
Summary of Contents for 250S
Page 1: ...METAL CUTTING BAND SAW MACHINE MODEL 250S INSTRUCTION MANUAL 250S 060505 R2...
Page 24: ...12 CIRCUIT DIAGRAM 22...
Page 25: ...OP 23...
Page 26: ...24...
Page 27: ...25...
Page 28: ...26...
Page 29: ...27...
Page 30: ...28...
Page 31: ...29...
Page 32: ...30...