Broadband Analyzer/Generator
ANT-20/ANT-20E
A-4
Application Guide
2.2
Test setup and description
Chapter 2 takes you step by step through the procedure for ATM layer QoS tests. The
procedure is based on a configuration with terminal emulation and signaling, to allow switched
virtual connections (SVCs) to be tested. The example selection of an end-to-end measurement
requires the use of a second instrument. The operating steps described apply to the left-hand
instrument in “Calling” mode.
Fig. A-4
Test setup for switched point-to-point connection
2.3
Application settings
VIs required
•
ATM Test Control
•
ATM Test Results
•
Signal Structure
⇒
Add the VIs required to the list of VIs used in the Application Manager.
The Application Manager should include at least the following instruments (see Fig. A-5):
Fig. A-5
“Application Manager” (Minibar) with ATM-Instruments
Summary of Contents for ANT-20
Page 8: ...Broadband Analyzer Generator ANT 20 ANT 20E vi Notes ...
Page 64: ...Broadband Analyzer Generator ANT 20 ANT 20E O 46 Operation Notes ...
Page 110: ...Broadband Analyzer Generator ANT 20 ANT 20E TB 16 Technical Background Notes ...
Page 126: ...Broadband Analyzer Generator ANT 20 ANT 20E iv Notes ...