APCD-WM001-1.0
10
2
Installation
The MMT9000 must be installed by a professional installer who is familiar with the FCC
regulations that apply to the MMT9000. Familiarity with installing vehicle-mounted 2-way radio
equipment is highly desirable. Best practices applicable to vehicle mounted radio systems
should be followed for providing power and grounding to the modem as well as antenna
placement on a vehicle.
2.1 Installation Checklist
A successful installation is divided into pre-installation, installation and post-installation stages,
with each stage outlined in the following checklists.
The Pre-Installation Stage Checklist involves the Network Operator as well as the installer.
Table 5 Pre-Installation Stage Checklist
When everything is ready for the installation stage, then the installer performs the following
steps:
Step
Discussion
The network must be properly configured by the
Network Operator to accept the new modem.
Ensure that all the needed parts are included.
The end-user’s PC requires an Ethernet Network
Interface to accept the data from the MMT9000.