GR64 Integrators Manual
Page: 96/104
This document is the sole and exclusive property of WAVECOM. Not to be distributed or divulged without prior written agreement.
Ce document est la propriété exclusive de WAVECOM. Il ne peut être communiqué ou divulgué à des tiers sans son autorisation préalable
Test Case
Test Summary
Ref Standard
Thermal Shock Test
Temp (low) : min storage
Temp (high) : max storage
6 min dwell at each extreme
0.5 to 3 min transition
Duration: 30 cycles (Group 2,3)
IEC 60068-2-14
Moist Heat Cyclic Test
Temp (low) : nominal ambient
Temp (high) : max operating
Humidity (high) : 95% ±5% RH
9 hr dwell at each temperature
3 hr transition between temps
Duration: 6 cycles x 24 hours
(144 hrs total)
IEC 60068-2-30
Operational Durability
SIM insertion : 500 cycles
System
connector
:
10,000
cycles
RF connector : 5,000
1/52 41-FEA 202 8370
Free Fall Test
1m drop height on to concrete
-
all sides
-
all faces
-
all corners
-
any extended features
IEC 60068-2-32 Test Ed