Hardware
Installation Manual
Page 12
8. Once the chassis is securely attached to the slider bracket system, the lift can be removed.
9. It is optional to remove the protective bottom plate that has been protecting the underside of
ROME during the installation process. Please be sure to store plate for future relocation. The plate can
be removed by unscrewing the 4 bolts at each corner of plate (Allen #6).
10. Slide the ROME Chassis into the rack.
11. Secure the ROME to the front rack screwing the ears to the rack.
4.2
Mounting the Patch Panel
Sufficient cable length is provided to mount the patch panel in the front or rear of the four post rack. Once the
ROME Chassis has been fully installed in the rack, the patch panel can be secured to the rack.
The patch panel is pre-connected to ROME with a fiber cable and can be secured to the rack after the ROME
Chassis is secured to the rack.
To install the patch panel, secure it to the posts of the rack using the mounting ears and screws.
Protective Bottom Plate
Patch Panel