background image

   

 

UPC #0941  2-Tier 24" Break Resistant PETG Card Rack

ASSEMBLY INSTRUCTIONS

Revised 07/21/14

Page 1 of 2

PARTS LIST

TOOLS REQUIRED: Flathead Screwdriver (Slatwall)

Drill with 3/8” Drywall Bit & Phillips Screwdriver (Drywall)

A

E

C

G

C

C

A

A

F

F

PART                                Quantity                     Reference

Screw Post 

  2 

                        

A

Slatwall Adapters 

  2 

                       

B

#8 - 32 Hex Nuts 

  2 

                        

C

Plastic Wall Toggler 

  2 

                          

D

Philips Head Screws 

  2 

                         

E

D

PARTS BAG

PART                                Quantity                     Reference

Rack 

  1 

                        

F

Divider

 

  3 

 

 

G

B

Align hole in Slatwall Adapter (B) with 

back side of hole in Rack (F).  Prongs extend 

back toward Slatwall and up. Attach using

Screw Post (A) from front and Nut (C)

on back.

Slatwall Assembly

Insert Divider (G) into

Rack (F).  

1

G

B

B

2

NOTE: Assemble for EITHER Slatwall or Drywall, not both.

Reviews: