Auditor 3R
Complete these four easy steps,
then start monitoring your site.
1. Before you begin
2. Connect your Auditor
3. Use the onboarding tool
4. Validate that your installation is correct
1. Bef
ore
you begin
Ensure y
ou ha
ve
the equipment
- See Auditor 3R
checklist belo
w. Y
ou’ll need an
internet
connect
ed smart de
vice (
e.g.
smartphone, tablet,
laptop
) to
configur
e
the Auditor and
capture inf
ormation about the ins
tallation.
A marker is useful
for numbering R
ogow
ski coil (R-c
oil) and cables
during installa
tion. Y
ou’ll need a
clamp meter f
or checking
current measur
ements.
Check
- Tha
t you ha
ve 3
5mm wide spac
e available
on the DIN rail.
If there is
not space,
additional DIN rails ma
y be mounted in the
cabinet or an
ext
ernal
enclosure used.
Ensure tha
t R-coil
can accommoda
te the
cable size (i.
e. cable
diameter fits
within R-coil
opening width).
Ensure ther
e is a w
ay t
o isolate the Audit
or voltage inputs
- An e
xisting or
new
circuit br
eaker
can be used depending
on the regula
tions in your jurisdiction.
A break
er is not included in the Auditor pack
age.
Auditor 3R har
dwar
e checklis
t:
• Audit
or devic
e - 2-unit wide
DIN-mount
• R
ogow
ski Coils - Supplied in a set
of three
• W
iring tails - single-phase
, 3-phase
or both
• Connect
ors -
green-c
oloured plas
tic plugs
ATTENTION:
Must be installed by a licensed electrician in accordance with standard electrical
safety regulations in your jurisdiction.
ONLY use this Auditor with the R-coils it is supplied with.
This Auditor is NOT compatible with third party coils or split-core Current Transformers.