background image

Page 14

  

 

 

 

  

 

 

 

 

 

 

 

 

 

Annual Sanitization

Using a clean eye dropper insert ½ teaspoon of hydrogen peroxide 

or common household bleach into the yellow tube.  This will flow into 

the tank once water is turned back on to unit.  Reattach yellow tube 

to the ball valve.  Follow start up procedure and drain two full tanks of 

water. Replace Post Carbon Filter.

Turn off the water supply to your RO system at the adapt-a-valve and 

open the RO faucet to drain the storage tank.

Sanitization procedure must be performed before a filter change.

Note:

Step 1

Step 3

Step 2

Disconnect the yellow tube from the ball valve on the storage tank 

(see page 6 for quick connect fitting use instructions).

Once all water in the tank is purged, check air pressure using an air pressure gauge, it should 

read between 5 - 7 PSI. (Digital air pressure gauge is recommended)

Check Air Pressure in the Tank

Important: 

Step 3

Check air pressure only when tank is empty of water!

Step 1         Turn off the incoming water supply to the RO.

Open the RO Faucet and allow water to drain from the tank until 

it is completely empty.

Step 2

Check air pressure in the storage tank when you notice a decrease in available water from 

the RO system. Air can be added with a bicycle pump using the schrader valve that is located 

on the lower side of the tank behind the blue plastic cap.

Tip:

When water from the RO faucet slows to a trickle, with the faucet still in the open 

position, you may add air to the tank to purge any left over water, this will ensure that 

the tank is completely empty. 

Step 4

Follow startup procedure on page 12.

Summary of Contents for WQT4RO11-50

Page 1: ...ter contact a WATTS representative or consult a professional plumber Test the water periodically to verify that the system is performing satisfactorily Discard small parts remaining after the installa...

Page 2: ...on block filter This helps ensure that chlorine and other materials that cause bad taste and odor are greatly reduced Stage 3 Membrane recommended change 2 5 years Stage three is the heart of the reve...

Page 3: ...nnection RO Water 9 Black Tube Connection Inlet 10 Tank Valve Installation Metal Tank 10 Tank Valve Installation Plastic Tank 10 Yellow Tube Connection RO Module to Storage Tank 11 Reverse Osmosis Mod...

Page 4: ...2 pH Parameters Maximum 11 Minimum 2 Iron Maximum 0 2 ppm TDS Total Dissolved Solids 1800 ppm Turbidity 5 NTU Hardness Maximum 10 Grains Per Gallon Hardness Recommended hardness not to exceed 10 grain...

Page 5: ...SOLD SEPARATELY 1 4 DRAIN SADDLE BRINE 11 1 2 3 4 7 7 6 5 12 10 9 Parts Diagram ITEM QTY PART DESCRIPTION 1 1 WQTSC 10 SEDIMENT FILTER 2 1 WQTCBC 10 PRE CARBON FILTER 3 1 WQTM50 10 MEMBRANE FILTER 50...

Page 6: ...hen drilling Watts accepts no responsibility for damage resulting from the installation of faucet Diamond tip bit recommended Marble Counter top We recommend contacting a qualified contractor for dril...

Page 7: ...ly Verify contents prior to installation 1 Plastic Adapt a Valve with black collet 1 Brass Adapter no washer 1 Brass Adapter with black washer 1 White rubber washer Make sure that the black collet is...

Page 8: ...en drill a 3 8 opening in the drain for 3 8 drain saddles OR 1 4 opening in the drain for 1 4 drain saddles Step 9 Peel and stick the foam gasket onto the drain saddle Step 10 Attach the drain saddle...

Page 9: ...en end of the 3 8 black tube into the 3 8 drain saddle Make sure it is pushed in all the way to the tube stop B 3 8 Tube Fitting Drain Saddle Locate the red 1 4 drain tube attached to the RO faucet Co...

Page 10: ...tube is pushed in all the way to the tube stop Thread the plastic valve onto the tank fitting Do not over tighten or the valve could crack Step 17 Step 18 Teflon tape must be applied in a clockwise di...

Page 11: ...cartridge Install the Cartridges Step 25 Insert each cartridge with a 1 4 turn in the clock wise direction The cartridge is installed properly when the label is facing toward the front of the unit Con...

Page 12: ...es The fourth tank can be used for drinking Open the RO faucet and leave it open until water begins to trickle out this may take a few minutes and the water will come out slowly Step 4 Turn on the inc...

Page 13: ...water should be tested periodically to verify that the system is performing satisfactorily Normally a membrane would be replaced during a semiannual or annual filter change However if at any time you...

Page 14: ...the tank is purged check air pressure using an air pressure gauge it should read between 5 7 PSI Digital air pressure gauge is recommended Check Air Pressure in the Tank Important Step 3 Check air pr...

Page 15: ...t a Valve Check frequently over the next 24 hours to ensure no leaks are present Step 5 Step 4 Note Step 2 Close the RO faucet allowing the storage tank to fill with water It may take 3 to 6 hours to...

Page 16: ...torage tank of water Set tank air pressure between 5 7 psi See previous page Low Pressure in Tank Use a Digital Air Gauge for best results The empty tank pressure should be 5 7 psi See page 14 4 Noise...

Page 17: ...Y INFORMATION Service Record Date of Purchase __________ Date of Install ___________ Installed by __________________ Serial No _____________________ Date 1st stage Sediment 6 months 2nd stage Carbon 6...

Page 18: ...n 11 5 The incoming water pressure must be between 40 and 100 pounds per square inch 6 Incoming water to the RO cannot exceed 105 degrees F 40 degrees C 7 Incoming TDS Total Dissolved Solids not to ex...

Reviews: