background image

5

STEP 2

Watts Chrome Top Mount  

Faucet Installation 

Gather and identify the faucet pieces.

Step A -

  Remove faucet base and faucet spout from their respective 

plastic bags . From above the sink, feed the faucet tubing 

and toggle bolt down through the 1¼" mounting hole in 

the sink . Ensure that the soft rubber gasket is uniformly 

positioned in between the base of the faucet and the top of 

the sink .

Step B -

  Align the faucet base so that the handle is on the right side 

and the base is sitting flush on the sink top . Turn the handle 

down (towards you) to the “ON” position to reveal the 

tightening screw (located where the spout will be inserted) . 

Using a phillips head screwdriver, turn the screw clockwise 

until the toggle bolt secures the faucet base snug onto the 

sink top . 

Step C -

  Once the faucet base is securely fastened to the sink top, 

insert the faucet spout into the faucet base until it is fully 

seated . Turn the handle up (away from you) to the “OFF” 

position .

Step D -

   Locate 

3

8

" blue tubing in parts bag, connect open end of 

the 

3

8

" tubing to the quick-connect fitting located on the 

faucet shank .

MiNiMUM

MaxiMUM

Mounting Hole Size

1"

1

1

4

"

Torque on Toggle Bolt

5 lb.in. (max)

Adapt-A-Valve™ Installation

Caution: Water supply line to the system must be from the cold 

water supply line only. 
Hot water will severely damage your system.

Configuration for 

1

2

 inch valve  

(using no brass fittings)
Figure 1

Configuration for 

3

8

 inch valve  

(using brass fittings)
Figure 2

Placement diagram for Adapt-A-Valve™
Figure 3

Step A –

  Turn off the cold water supply to the faucet by turning the 

angle stop valve completely off .

Step B –

  Attach the Adapt-A-Valve™ as illustrated in Fig 2, Fig 3, 

choosing the configuration that fits your plumbing needs .

Step C –

  Completed Valve installation Figure: 3 .

STEP 3

Figure 1

Figure: 2

Figure: 3

Hot

Supply

Cold

Supply

Summary of Contents for PWSYS-RO-MAN5

Page 1: ...ddle Installation 6 3 8 Black Tube Connection 6 Green Tube Connection 6 Reverse Osmosis Module Mounting 6 Red Tube Connection 7 Check Air Pressure in the Tank 7 Tank Elbow Installation 7 Blue Tube Con...

Page 2: ...e osmosis uses a semi permeable membrane however by applying pressure across the membrane it concentrates contami nants like a strainer on one side of the membrane producing crystal clear water on the...

Page 3: ...rench Sharp Knife 1 2 5 8 Open End Wrenches Phillips Screw Driver Needle Nose Pliers Adjustable Pliers Electric Drill 1 8 Drill Bit 1 4 Drill Bit 3 8 Drill Bit Hardness Recommended hardness not to exc...

Page 4: ...be removed before inserting into fitting Fitting grips before it seals Ensure tube is pushed into the tube stop Push the tube into the fitting to the tube stop The collet gripper has stainless steel...

Page 5: ...ed to the sink top insert the faucet spout into the faucet base until it is fully seated Turn the handle up away from you to the OFF position Step D Locate 3 8 blue tubing in parts bag connect open en...

Page 6: ...black tube through black compression nut Insert black tube into the opening in the drain saddle and hand tighten the black nut Add 1 4 turn with a wrench STEP 5 STEP 6 Green Tube Connection Step A Lo...

Page 7: ...a de crease in available water from the RO system Air can be added with a bicycle pump using the schrader valve that is located on the lower side of the tank behind the blue plastic cap Step A Turn of...

Page 8: ...er tempera ture and water pressure Note During the fill period you may hear water trickling due to the Reverse Osmosis Process Step D After the Tank has filled open the RO Faucet to flush the tank com...

Page 9: ...arbon Block Filters 1 Final Inline Filter Note Sanitizing of unit is recommended Step A Perform Steps A through E in the 6 Month System Main tenance Note If not sanitizing the system skip to Step H St...

Page 10: ...ote A water sample may be sent to Watts for a free diagno sis of your membrane performance To send a water sample use two 2 clean containers and fill cup of tap water in one container and cup of rever...

Page 11: ...et or drain Air gap faucet Location of drain saddle Higher capacity membrane High water pressure Inherent sound with air gap faucets See diagram for proper location of drain saddle Normal with high ca...

Page 12: ...lso called chloramine where it does convert trivalent arsenic to pentavalent arsenic may not con vert all the trivalent arsenic in to pentavalent arsenic If you get your water from a public water util...

Page 13: ...ION 1 7100454 Gac Post Filter 2 7100446 Carbon Block 3 7100331 Sediment Filter 4 7300043 Manifold Bowl 5 7300046 Manifold Membrane Vessel 6 7300058 O Ring For Manifold Bowl 7 7300057 O Ring For Membra...

Page 14: ...Date of Purchase Date of Install Installed by Date 1st stage Sediment 6 months 2nd stage Carbon 6 months 3rd stage Carbon 6 months Final Filter Carbon 1 year TFM Membrane 2 5 years Notes Service Reco...

Page 15: ...15...

Page 16: ...dies stated in such warranties are exclusive and are the only remedies for breach of warranty EXCEPT FOR THE APPLICABLE PRODUCT WARRANTY IF ANY WATTS MAKES NO OTHER WARRANTIES EXPRESS OR IMPLIED TO TH...

Reviews: