11
Top View
Installation Diagrams - Series LC-150 Simplex Systems
1. All dimensions are on page 6 of this manual & unless other-
wise noted are ± 1 inch (25mm).
2. All items shown in phantom line are to be provided by others.
3. All dimensions are subject to change without any notice.
4. Install unions fittings on inlet, outlet & drain plumbing connections.
5. Provide a 2 feet minimum clearance above mineral tank for
filling media.
6. A GFCI equipt electrical outlet should be provided within 5 feet
of equipment location.
7. Use dielectric unions on plumbing connections of control valve
when dissimilar metals are present.
8. Provided system shall not be subject to any vacuum. If risk of
vacuum is present, install siphon break on drain line & install
vacuum relief valve Watts ordering code # 0556031 on inlet line.
9. Brine tank dimensions shown on table are factory selected for
use with the specified system size.
10. Do not install drain line directly to a drain. For proper drain
connection follow all national, state and local codes. Do not
construct drain line to elevations that exceed 4 feet above
the control valve's drain port.
11. The full weight of the piping and valves must be supported
by pipe hangers or other means.
12. Inlet and outlet headers need to be sized according to flow
rate requirements by others.
13. Power requirements: 115v/60hz 2.7 Amps per control valve
unless otherwise specified.
14. Brine tank must be located within 10 feet of system control
valve and on a common floor elevation with mineral tank to
ensure proper brine draw operation.
15. Use factory supplied brine tubing. Do not use smaller
diameter tubing than what is supplied.
16. Limit inlet pressure to not exceed maximum published
operating pressure.
Installation Reference Notes For All System Installation Drawings:
Front View
Side View
Drain and Brine Connection Detail
Control Valve Brine
Connection Port-
Connect brine tube
from brine tank. Use
tube fittings located in
system manual bag.
Control
valve drain
connection
Drain Line Flow Control Housing & Flow Button - Flow
button must face the flow of the drain water. Point arrow
on drain line flow control housing in direction of flow.
MINERAL TANK
POLY TUBING
(SEE NOTE 15)
BRINE TANK
(SEE NOTE 14)
INLET UNION
ISOLATION VALVE
(SEE NOTE 4)
INLET
(SEE NOTE 12)
VACUUM RELIEF
(SEE NOTE 8)
BYPASS VALVE
(NORMALLY CLOSED)
HEADER PIPE
(SEE NOTE 12)
OUTLET
(SEE NOTE 12)
SAMPLE PORT
OUTLET UNION ISOLATION VALVE
(SEE NOTE 4)
OUTLET PIPE
1.5" FLOW METER
SAMPLE PORT
INLET PIPE
DRAIN LINE
(SEE NOTE 10)
POWER CORD
(SEE NOTE 13)
Drain water out to drain
Summary of Contents for LC-150 Series
Page 14: ...14 Wiring Diagram SXT ...
Page 16: ...16 NXT2 Controller Display ...
Page 52: ...52 Injector Flow Data and Draw Rates Down Flow ...