6
HIU2-IM-DE-W-DE-08-2018-Rev1_DE-enUS | Art. No. 10078860
EN
ENGLISH
3.6 Personnel groups
Only qualified persons may install and operate the HIU 2 or
perform maintenance work.
Operator
An operator is deemed to be qualified if they have read these
operating instructions and understood the potential hazards
associated with improper behavior.
Fitter/commissioning engineer
A plumber or commissioning engineer is in a position, taking
into consideration the applicable standards, provisions, regu-
lations and laws and his/her technical training and technical
knowledge, to carry out work on the HIU 2 and to detect and
prevent potential hazards.
3.7 Information on the operating environment
Limescale deposits (from hard water) and corrosion, as well
as chemical and physical reactions, can cause damage to the
home station.
The selection of material for the plate heat exchanger (copper
or stainless steel) must be checked with reference to the water
quality (corrosion resistance).
The system planner is responsible for evaluating these
parameters and taking appropriate precautions.