9
Note:
Locate the components identified in previous
“Preparing
the System for Installation”
Step 2 for use in this section.
See Installation Diagrams on page 12 for additional
information.
Step 1 -
The system must be installed in a vertical position.
Place the system in the desired location. Make sure that the
mounting surface is level and sturdy enough to support the
weight of the system while in operation.
Step 2 -
Prepare the filter housing for installation by first
unthreading and removing the union nuts of both the inlet and
outlet ports in a counterclockwise motion. Install the plumbing
adaptor O-ring into the O-ring grove of each inlet and outlet port,
attach plumbing adaptors and reattach union nuts tightening
hand tight only, DO NOT use wrenches. DO NOT use thread
sealant of any kind on the union threads. Use only silicone
lubricant on O-rings.
Note:
System has an optional outlet port to accommodate
different plumbing arrangements. Outlet plumbing adaptor can
be relocated to optional outlet port if desired.
Step 3 -
Using a primer and glue system approved for pres-
surized PVC potable water plumbing applications, install the 2"
Male Glue X 1" FNPT PVC plumbing bushings into the inlet and
outlet plumbing adaptors.
Installation
Step 4 -
Apply plumbing tape to the inlet thread of the 1" inline
flow meter. An arrow on the flow meter indicates the direction of
flow. Apply plumbing tape to the outlet thread of 1" flow meter if
required by the outlet plumbing method used. Insert flow meter into
system outlet plumbing port with the arrow pointing in the direction
of flow. Hand tighten only, clockwise, DO NOT use wrenches.
Step 5 -
Locate the locking tab at the bottom of the monitor
screen. Pull out on locking tab and separate monitor screen from
monitor base.
Step 6 -
Mount monitor base to mounting surface using hard-
ware provided according to the image below. Then press monitor
screen back onto base until it is secured with locking tab.
A
INSTALL AS SHOWN
& APPLY PLUMBING TAPE
TO PREVENT LEAKS
INLET PRESSURE
GAUGE
TO FACE AT PROPER
ANGLE FOR PROPER
VISUALIZATION
1
2
3
4
5
7
6
8
DETAIL B
MONITOR
BASE
MONITOR
SCREEN
LOCKING
TAB
*MOUNTING
SURFACE ANCHOR
FOR NO. 6
SCREW SIZE
MONITOR
BASE
NO. 6
SCREW
SIZE
MONITOR
SCREEN
(MOUNTING
SURFACE)
PRE-DRILL HOLE
RECOMMENDED
DRILL BIT SIZE:
3
⁄
32
"
*DO NOT USE IF STUD IS LOCATED