Modulex EXT Commercial Series Boilers User Manual
CHAPTER 8: Maintenance Schedule
Page
128
of
144
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0095_0H
09/15/2017
Phone: 800-526-0288
GF-139
Disassembling the Boiler for Maintenance
– Continued
Figure 8-11: Removing the Burner Module Plate Covers (Step 7)
8. Use a 36 mm wrench to disassemble all the gas pipes from the gas manifold. See Figure
8-12.
Figure 8-12: Removing the Gas Pipes from Gas Manifold (Step 8)
B
C
A