4.9.2 Low Water Cutoff (LWCO) - Standard C-More Test
Perform the standard Low Water Cutoff test using the C-More Controller as described below.
Low Water Cutoff (LWCO) - Standard C-More Test Instructions
1. Turn the AC power to the unit to the
ON
position.
2. Press the TEST switch on the C-More Controller and confirm that the blinking
LOW
WATER LEVEL
message appears on the C-More display within 4 seconds.
3.
Press the RESET key, followed by the Clear button, and confirm that the
LOW WATER
LEVEL
message is cleared.
4.10 SHUTTING BOILER DOWN FOR EXTENDED PERIOD
If the boiler is to be taken out of service for an extended period of time (one year or more), the
following instructions must be followed.
Shutting Boiler Down For An Extended Period Instructions
1. Set ON/OFF switch on the C-More Controller to the
OFF
position to shut down the boiler’s
operating controls.
2. Disconnect AC power from the unit.
3. Close the water supply and return valves to isolate boiler.
4. Close external gas supply valve.
5. Open relief valve to vent water pressure.
4.11 PLACING THE BOILER BACK IN SERVICE AFTER A
PROLONGED SHUTDOWN
After a prolonged shutdown (one year or more), the following procedures must be followed:
Placing The Boiler Back In Service After A Prolonged Shutdown
Instructions
1. Review installation requirements included in Section 2 of the
Benchmark 750 – 3000
Installation and Startup Guide
, OMM-0131 (GF-205-LA).
2. Inspect all piping and connections to the unit.
3. Inspect exhaust vent and air inlet duct work (if applicable).
4. Perform initial startup per Section 4 of the
Benchmark 750 – 3000 Installation and Startup
Guide
, OMM-0131 (GF-205-LA).
5. Perform safety device testing and scheduled maintenance procedures per Sections 4 and
5 of this manual.