Benchmark 750-3000 Operation, Service & Maintenance Guide-Latin America
SECTION 2: OPERATION
Page
12
of
162
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0132_A
01/02/2018
Ph.: 800-526-0288
GF-206-LA-LA
2.2 C-MORE CONTROLLER DESCRIPTION
All Benchmark boilers utilize the C-More Controller shown in Figure 2-1. This panel contains all
of the controls, indicators and displays necessary to operate, adjust and troubleshoot the boiler.
These operating controls, indicators and displays are listed and described in Table 2-1.
Additional information on these items is provided in the individual operating procedures and
menu descriptions provided in this section.
Figure 2-1: C-More Controller Front View
1
12
11
10
9
8
7
5
4
3
6
2