Benchmark 750-3000 Operation, Service & Maintenance Guide-Latin America
SECTION 4 – MAINTENANCE
OMM-0132A
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
39
of
162
GF-206-LA-LA
Ph.: 800-526-0288
01/02/2018
Figure 4-1b: BMK 1500/2000 Burner Assembly (Removed from Boiler)
Figure 4-1c: BMK 2500/3000 Burner Assembly (Removed from Boiler)
BLOWER
BLOWER
PLENUM
IGNITER-
INJECTOR
ASSEMBLY
FLAME
DETECTOR
BURNER
PLENUM FLANGE/
BURNER TOP PLATE
FLAME
OBSERVATION
PORT
AIR/FUEL
VALVE
BLOCKED
INLET
SWITCH
LEAN O
2
SENSOR
A/F VALVE
PLENUM
BLOWER
BLOWER
PLENUM
IGNITOR-INJECTOR
ASSEMBLY
FLAME
DETECTOR
BURNER
BURNER
PLATE FLANGE
FLAME OBSERVATION PORT
AIR/FUEL
VALVE
BLOCKED
INLET
SWITCH
LEAN O
2
SENSOR
A/F VALVE
PLENUM