Benchmark 750 – 1000 Boiler User Manual - INTERNATIONAL
CHAPTER 6 – SAFETY DEVICE TESTING
OMM-0119_0A
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
83
of
170
GF-130-I
Ph.: 800-526-0288
11/03
/2016
Figure 6-7: Air/Fuel Valve Cover Location
Figure 6-8: Air/Fuel Valve Purge and Ignition Switch Locations
AIR/FUEL VALVE COVER
(Rotate counter-clockwise to
remove)
Ignition Position Switch
Purge Position Switch
AIR IN
TO BLOWER