Benchmark 750 – 1000 Boiler User Manual - INTERNATIONAL
CHAPTER 4 – INITIAL START-UP
Page
56
of
170
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0119_0A
11/03/2016
Ph.: 800-526-0288
GF-130-I
4.2.1 Required Tools & Instrumentation
The following tools and instrumentation are necessary to perform combustion calibration of the
unit:
•
Digital Combustion Analyzer: Oxygen accuracy to ± 0.4%; Carbon Monoxide (CO) and
Nitrogen Oxide (NOx) resolution to 1PPM.
•
0 to 16 inch W.C. (0 to 4.0 kPa) manometer or equivalent gauge and plastic tubing.
•
1/4 inch NPT-to-barbed fittings for use with gas supply manometer or gauge.
•
Small and large flat blade screwdrivers.
•
Tube of silicone adhesive
4.2.2 Installing Gas Supply Manometer
The gas supply manometer (or gauge) is used to monitor the gas pressure on the downstream
side of the SSOV during the Combustion Calibration procedures described in section 4.3.
The gas supply manometer is installed at the upstream and/or downstream location shown in
Figure 4-1.
Figure 4-1: 1/4 Inch Gas Plug Location for Combustion Calibration
SSOV
TO AIR/FUEL VALVE
MANUAL SHUT-OFF
VALVE
LEAK DETECTION
BALL VALVE
1/4” NTP PLUG
(Install manometer here for
combustion calibration)