VD2: 10/14/14
Page 21 of 24
BMK1.5 LN Boiler 24-Month Maintenance Kit #58025-05 Instructions
Technical Instruction Document
TID-0066_0B
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, New York 10913
•
Phone: 800-526-0288
6.3.1.1
Low Water Cutoff (LWCO) - Capacitor Electrical Short Test
This test determines if there is an electrical short between the LWCO capacitor and the heat
exchanger. Perform the capacitor electrical short test as described below.
LWCO Capacitor Electrical Short Test
1. Turn OFF AC power to the unit.
--WARNING! -
High voltages are used to power these units and so it is required
that power applied to these units is removed first before
performing the procedure described in this instruction. Serious
personal injury or death may occur if this warning is not observed.
2. Remove the Shell Harness Cable (male) connector from the P-5 (female) connector on the
rear panel of the C-More controller (see Figure 14).
Figure 14: Removing Cable from P5 Connnector
3. Using an ohmmeter, connect one ohmmeter probe to the LWCO capacitor terminal on
the unit shell as shown on left in Figure 15.
4. Connect the second ohmmeter probe to Pin #6 of Shell Harness Connector (removed
from the C-More controller) as shown on right in Figure 15.
Unplug Shell
Harness Cable
from P5 Connector